KSC, Inc.
UT Tyler Medical Education Building / Coming 2025

UT Tyler Medical Education Building / Coming 2025

Tyler, Texas | 54,000

State-of-the-art, five-story facility, serving as the new hub for the university’s School of Medicine. It is the seventh medical school within the University of Texas System.

Product Types

  • MCM Panels
  • Garage Screen & Facade Systems

Construction Company:

Skanska

Construction Company:

HGR

Architect:

Fitzpatrick Architects

Fabricator:

Form Metal

Installer:

KSC, Inc.

Download Details

Product Use Case

Form’s Skyline II and Horizon I systems shape the project’s custom 54,000-square-foot facade, featuring aluminum composite material and perforated aluminum plate. KSC partnered to install the systems, delivering a solution that seamlessly blends functionality with design while meeting the project’s architectural and sustainability goals.